1. Setup
Rooms and areas to be painted are scheduled with the customer.
Large furniture is moved into the center of the room.
Furniture is covered with plastic.
Floors are covered with drop cloths.
2. Preparation
Walls are scuff-sanded if needed.
Holes and cracks in walls are filled.
Gaps in trim are caulked.
Washing is done where required.
3. Painting
Repaired areas are primed.
Paint is applied with a brush, roller or sprayer depending on the surface.
Ceiling and walls are painted to proper coverage and finish color.
Clean cut lines between trim & walls.
4. Clean-up
Furniture is moved back to original positions.
Floors and carpets are thoroughly vacuumed and swept.
All garbage is removed.
Touch-up paint is labeled and left with the customer.
5. Inspection
Before the crew packs up their equipment, a "wet walk-around" is done
Final touch-ups are noted on a 'punch list' & are completed before the crew leaves.
The Customer Comment Card is completed by the customer |